External Article

Database Deployment Problems Survey

Red Gate is looking to build tools and features to help reduce the risk of database deployment. In order to achieve this, we need to get a better understanding of the most common deployment problems you are encountering when moving changes from development to production. Please help by filling in our two-page survey.

External Article

SQL Monitor Custom Metric: Buffer Pressure

Trying to determine if you have pressure in your buffer allocations can be difficult. This metric reliably indicates if you have a buffer problem using the memory dump from DBCC MEMORYSTATUS() and comparing Target Committed to the Current Committed allocations. If you hit negative numbers you are looking at a buffer issue.

Technical Article

PASS Summit, Seattle, WA

Join the world's largest gathering of SQL Server and BI professionals in Seattle on November 4-7. PASS Summit is your conference – planned by and for the SQL Server community. Red Gate will be exhibiting, so drop by their booth and say hello. Register while space is available.

Blogs

How to Find Expensive Queries in Amazon Redshift

By

Slow-running queries can degrade your Redshift cluster’s performance and lead to increased costs. Identifying...

The Notification Trap: How Input Fatigue Is Killing Deep Work in Tech

By

If you've been here before, you know this blog is usually about SQL Server,...

Designing a Storage Load Test for SQL Server

By

I’ve been doing storage load tests for SQL Server for a long time, both...

Read the latest Blogs

Forums

How Long is a Long I/O?

By Steve Jones - SSC Editor

Comments posted to this topic are about the item How Long is a Long...

T-SQL Trigonometric Functions in SQL Server

By Imran2629

Comments posted to this topic are about the item T-SQL Trigonometric Functions in SQL...

Half of All Engineers

By Steve Jones - SSC Editor

Comments posted to this topic are about the item Half of All Engineers

Visit the forum

Question of the Day

How Long is a Long I/O?

In SQL Server 2025, a long I/O is recorded in the error log with message 833. How long much an I/O request be outstanding before this message is written to the log?

See possible answers