External Article

A TDD Journey: 3- Mocks vs. Stubs; Test Frameworks; Assertions; ReSharper Accelerators

Test-Driven Development (TDD) involves the repetition of a very short development cycle that begins with an initially-failing test that defines the required functionality, and ends with producing the minimum amount of code to pass that test, and finally refactoring the new code. Michael Sorens continues his introduction to TDD by implementing the first tests and introducing the topics of Test doubles; Test Runners, Constraints and Assertions.

Blogs

How to Find Expensive Queries in Amazon Redshift

By

Slow-running queries can degrade your Redshift cluster’s performance and lead to increased costs. Identifying...

The Notification Trap: How Input Fatigue Is Killing Deep Work in Tech

By

If you've been here before, you know this blog is usually about SQL Server,...

Designing a Storage Load Test for SQL Server

By

I’ve been doing storage load tests for SQL Server for a long time, both...

Read the latest Blogs

Forums

How Long is a Long I/O?

By Steve Jones - SSC Editor

Comments posted to this topic are about the item How Long is a Long...

T-SQL Trigonometric Functions in SQL Server

By Imran2629

Comments posted to this topic are about the item T-SQL Trigonometric Functions in SQL...

Half of All Engineers

By Steve Jones - SSC Editor

Comments posted to this topic are about the item Half of All Engineers

Visit the forum

Question of the Day

How Long is a Long I/O?

In SQL Server 2025, a long I/O is recorded in the error log with message 833. How long much an I/O request be outstanding before this message is written to the log?

See possible answers