Stairway to SSAS Tabular Level 10: Multiple Dates in Fact Table

  • Thomas LeBlanc

    SSCertifiable

    Points: 7980

    Comments posted to this topic are about the item Stairway to SSAS Tabular Level 10: Multiple Dates in Fact Table

    Thomas LeBlanc, MVP Data Platform Consultant

  • This was removed by the editor as SPAM

  • Patrick Index

    SSC Rookie

    Points: 27

    Can you not just create different views on the date dimension table as required?

  • Thomas LeBlanc

    SSCertifiable

    Points: 7980

    Yes, creating views can be used as sources to 'tables' in Analysis Services.

    Thomas

    Thomas LeBlanc, MVP Data Platform Consultant

  • This was removed by the editor as SPAM

  • This was removed by the editor as SPAM

  • This was removed by the editor as SPAM

  • This was removed by the editor as SPAM

Viewing 8 posts - 1 through 8 (of 8 total)

You must be logged in to reply to this topic. Login to reply