Viewing 2 posts - 1 through 3 (of 3 total)
I'm speaking about the 'connection' you would drag from the first task in the package to the second task in the package. In the CONTROL FLOW window, they're called 'precedence...
January 30, 2007 at 7:52 am
#686452
The configuration steps are as follows...
January 23, 2007 at 10:00 am
#684986