Maintenance Plan and Jobs

  • Hi,

    my question is what is the difference when starting a maintenance plan as a server job or with the scheduling directly for the maintenance plan?

    Thanks

    Steffen

  • No difference. They are the same thing. Scheduling inside the plan adds a job to the server. With SP2 you'll be able to add multiple schedules.

Viewing 2 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply