how to create a shedule?

  • Hi,

    I want to run one stored procedure for every 5 minutes.

    So how can I make a schdule for that One?

  • You need to create a new job for the same. In the job's step insert the sp you need to run.

    You can then schedule it using the schedule tab on the left and set the desired frequency.

  • ok Thank you.Its Working

Viewing 3 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply