Custom display folder for calculations

  • Using VS 2005, I have some calculations I would like to put into a separate folder. I was able to indicate a new folder name from Calculation Properties of the calculation tab but the cube processing is not putting these calcs into the folder, nor erroring.

    I tried once with Associated Measure Group set and then tried with removing that and neither way worked.

    I have folders set up for the other measures with no problem, it's just the calcs that I seem to be missing a setting or tweak. Anyone willing to share what the secret ingredient is that I'm missing??

  • It doesn't sound like you're missing something.

    I would make sure that cube has been processed,if not processed already, and that calculation is not erroring out.

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply