• Brian, sorry, nothing is jumpimg out at me. As I say I have only seen this when the job ran at the same time as the clocks going back and if memory serves me on very long running jobs which were eventually cancelled or failed.

    Interesting the nodes are out, got to be worth getting them in synch. Not sure quite how this would affect it because I would have thought the job would fail if there was a failover whilst the job was running.

    ---------------------------------------------------------------------