• MysteryJimbo (2/13/2014)


    I find it extremely strange that a migration should be estimated to take a week. With enough preparation you could have this done less than a day.

    I have completed several hundred migrations, with DTS, SSIS and very large dbs and none of them have taken longer than 4 hours.

    We have almost a couple of hundred packages that need to be converted, albeit not too complex (2 connections and 2-3 steps). I have anticipated it'll take considerably longer than my example. I'd be curious to know how to accelerate the process.