• Pretty sure there isn't a setting to fix this in the cube - it sounds like Excel is auto-converting this not SSAS telling Excel that it's a number

    The only thing I can think that you could do is have an attribute of the date that is a number (yyyymmdd) and include that on the drilldown rather than the long date

    Mack