• The Primary DB was offline for less than 1 minute.

    There were no interruptions for the LS_Copy or LS_Restore jobs.

    The primary DB state change occurred at around 10:00 local server time and the LS_Restore job for the next TRN file from 10:15 local server time failed with the below errors.

    "Error: The log backup file '\\ServerName\DBNAME_db\DBNAME_DB_20121203221511.trn' was verified but could not be applied to secondary database 'DNAME_DB'.(Microsoft.SqlServer.Management.LogShipping)"

    "Error: This backup set cannot be applied because it is on a recovery path that is inconsistent with the database. The recovery path is the sequence of data and log backups that have brought the database to a particular recovery point. Find a compatible backup to restore, or restore the rest of the database to match a recovery point within this backup set, which will restore the database to a different point in time. For more information about recovery paths, see SQL Server Books Online.

    RESTORE LOG is terminating abnormally.(.Net SqlClient Data Provider) *"

    Thanks,