• I would love to do it in the proposed design of doing it in separate job steps or through separate jobs. What I am having trouble is how I would cascade the steps/jobs based on the success or failure of the first step/job which is the migration. I am not sure how I would take the result of a query and translate it to job step logic. Also, I am trying to figure out how a failure notification would fit into this. I do not want a failure notification everytime the job runs looking for the flag value indicating success, but I do want to get the notification when the window for the job to have run is complete.

    I hope I am making it clear at what I am looking for.

    Any help towards this effort is greatly appreciated

    Thanks

    KR