synchronisation in sqlserver2005

  • Can u tell em how i can set a schedule to sync my db in sqlserver2005 with that of sage (has its own db engine) which is all together on a another server.Am not really familiar with SSIs package.. so if u cld throw soem light to me wld be really nice

    Thanks

  • First you need to post in the correct forum. The titles are all above, so this would be posted in the SSIS forum (I've moved it).

    Next, please describe what you want to do. Synch can mean a lot of things. Give us more details about what exactly you want to do, move data from one table, match up fields/values between two tables, move the entire db, etc.

Viewing 2 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply