Determining how long a SQL Job takes

  • If that single job backs up everything you need, and the databases haven't grown significantly since the last backup, then, yes, the Run Duration from the job history should be roughly the amount of time you need.

  • I hope you're running backups every day right now.

  • homebrew01 (9/28/2009)


    I hope you're running backups every day right now.

    We are.

    Kindest Regards, Rod Connect with me on LinkedIn.

Viewing 3 posts - 1 through 4 (of 4 total)

You must be logged in to reply to this topic. Login to reply