Timing out scheduled jobs

  • I hate to bump an old thread like this, but I have almost exactly the same need and didn't want to post a brand new topic for this. The only solution I can come up with is to add a separate job that checks the running time of the job in question (some how), and if it has exceeded my expected run time to cancel the job and/or kill the SPID, but is there a more elegant way to accomplish this?

Viewing post 1 (of 2 total)

You must be logged in to reply to this topic. Login to reply