Apply 2012 SP1 CU3 to Primary server of mirrored pair.

  • Hi, I have 2 SQL2012 64 bit servers that are set up as a mirrored pair. There is no witness. The mirror already has SP1 CU3 on it and I now need to patch the Primary server to the same level. Fortunately at the moment we don't need ultra high availability on this system so I can get a bit of downtime without having to think about failing over or using the mirror whilst I do the install. Therefore I can literally just go on to the Primary server and apply the patch when there are no connections.

    However before I start, do I just need to 'pause' mirroring whilst I do this and 'resume' it when it's complete?

    Thanks

Viewing 0 posts

You must be logged in to reply to this topic. Login to reply