hi ,

i have these columns in the table and made this table as the FACT table and also using time intelligence filter in the PPS2010..
i have measures , sum (materials), sum (sales) and sum (material_%)

in the PPS dashboard design i have included this cube and all the measures.. and using an analytic chart..
i have developed separate graphs for each columns (material, sales, material_%)..

for the sales and materials there is no problem , when i use the time filter

in the material_% graph i used the time filter current quarter in months (showing three months ) shows the correct value..
when i use the current quarter filter (sum of all the 3 months) its showing 146% (83 +33 +30) --> for actual values
and 150 % ( 50+50+50) --> for target values

actually it showed show me 46% for actual and 50% for target ,
it should be sum of material in all the 3 months / sum of sales in all the 3 months
but its just calculating sum of material_% column of all the 3 months


time filter : year :: Halfyear ::quarter:: Month:BigGrinay

Month Year Material sales Material_% [ material / sales]
Jan_Act 2011 500 600 83
Jan_target 2011 400 800 50
Feb_Act 2011 300 900 33
Feb_target 2011 300 600 50
Mar_Act 2011 300 900 30
Mar_target 2011 300 600 50
......
Jan_Act 2012 0 0 0
Jan_target 2012 600 1000 60
.............
Dec_Act 2012 0 0 0
Dec_target 2012 600 800 75


please help me to sort out this issue ..


Thanks n Regards
T.Navin
denglishbi
denglishbi
Right there with Babe
Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)Right there with Babe (769 reputation)

Group: General Forum Members
Points: 769 Visits: 1362
The material % should be setup as a calculation in the cube versus a physical column and measure reference. Right now it is simply setup with an aggregation type of sum and that is not what you want. Setup the calculation in the cube and do the division there and you will get the results that you are looking for. You can also setup a calculation in the KPI setup in PPS if needed as well, but having the logic centralized in the cube would be the route to go.

----------------------------------------------------------------------------------------
Dan English - http://denglishbi.wordpress.com
Go


Permissions

You can't post new topics.
You can't post topic replies.
You can't post new polls.
You can't post replies to polls.
You can't edit your own topics.
You can't delete your own topics.
You can't edit other topics.
You can't delete other topics.
You can't edit your own posts.
You can't edit other posts.
You can't delete your own posts.
You can't delete other posts.
You can't post events.
You can't edit your own events.
You can't edit other events.
You can't delete your own events.
You can't delete other events.
You can't send private messages.
You can't send emails.
You can read topics.
You can't vote in polls.
You can't upload attachments.
You can download attachments.
You can't post HTML code.
You can't edit HTML code.
You can't post IFCode.
You can't post JavaScript.
You can post emoticons.
You can't post or upload images.

Select a forum

































































































































































SQLServerCentral


Search