Thank you for the replies.
OK so let it run unless there is a reason to re-initialise. Thank you.
And I can take a full backup at any time and it wont affect the log shipping?
In that case in the event of us needing to do a point in time restore, I could take the previous nights full backup + subsequent log backups (that would have been log-shipped to our remote site)?
If so thats good as I thought we had lost the ability to do point in time restores with the log shipping.
Thanks again
David