Maintenance Plan corrupted – Backup Plan?

  • Hi,

    Daily backup plan was failed when start the Backup Jobs. It was successful after restart the server, what could be reason? Why SSIS packages get it corrupted and not loading during start the Job?

    Error Mesages

    Microsoft (R) SQL Server Execute Package Utility Version 10.0.2531.0 for 32-bit Copyright (C) Microsoft Corp 1984-2005. All rights reserved. Started: 8:47:09 AM Error: 2013-08-21 08:47:09.65 Code: 0xC0010018 Source: Description: Error loading value "<DTS:ConnectionManager xmlns:DTS="www.microsoft.com/SqlServer/Dts"> <DTS:Property DTS:Name="DelayValidation">0</DTS:Property> <DTS:Property DTS:Name="ObjectName">Local server connection</DTS:Property> <DTS:Property DTS:Name="DTSID">{0BC551FA-4FAF-4EB2-8" from node "DTS:ConnectionManager". End Error Could not load package "Maintenance Plans\DB_BACKUP" because of error 0xC0010014. Description: One or more error occurred. There should be more specific errors preceding this one that explains the details of the errors. This message is used as a return value from functions that encounter errors. Source: Started: 8:47:09 AM Finished: 8:47:09 AM Elapsed: 0.406 seconds. The package could not be loaded. The step failed.

    Thanks

    ananda

  • Is there any chance these jobs were created on a 64-bit server? If so, please check this link: http://www.sqlservercentral.com/Forums/Topic737169-148-1.aspx#bm1420339

    ______________________________________________________________________________Never argue with an idiot; Theyll drag you down to their level and beat you with experience

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply