|
|
|
Grasshopper
      
Group: General Forum Members
Last Login: Monday, April 02, 2012 5:05 AM
Points: 20,
Visits: 30
|
|
I have the following configuration on my client's production environment:
------------------------------------------------------------------- SQL SERVER: Microsoft SQL Server Enterprise Edition (64-bit) OPERATING SYSTEM: Microsoft Windows NT 6.0 (6002) Platform: NT x64 Version: 10.0.5500.0 Database size : 2 TB SSAS(2008)cube size:14.4 GB ------------------------------------------------------------------- PROCESSOR: INTEL(R) XEON(R) CPU X5650 @ 2.67 GHZ 2.67 GHZ (2 PROCESSORS) MEMORY : 24 GB SYSTEM TYPE : 64- BIT OPERATING SYSTEM WINDOWS EDITION : WINDOWS SERVER ENTERPRISE SERVICE PACK2 --------------------------------------------------------------------
I have my sql server(2008) and SSAS(2008) on the same server(Windows Server 2008). Approximately 10 to 12 GB of data is getting increased daily in SQL Server database. Now I need to migrate my SSAS(2008) on a separate server.So what should be the server configuration ? i.e. How much RAM, Hard disk,Processor is required?
|
|
|
|